Get a free estimate

Tell us about the job and we will call to set up a site visit.

Or call (808) 387-5006

  • 15+years paving on Oahu job sites
  • 50+customers: homes, HOAs and businesses
  • 8paving services from one crew
  • 48–72htypical time to a written estimate

What we do

From one pothole to a full parking lot. Every job starts with a site visit and a measured scope.

  • Newly paved private asphalt road winding through open pasture

    Asphalt Paving

    New asphalt for driveways, private roads and parking lots, built on a properly graded, compacted base.

  • Freshly seal coated asphalt lot beside a lighthouse

    Seal Coating

    A protective coat that shields asphalt from UV, rain and oil and brings back the deep black finish.

  • Milled road surface during cold planing, ready for an overlay

    Cold Planing

    Asphalt milling that removes the worn top layer and leaves a uniform surface ready for an overlay.

  • New asphalt patch outside a commercial building, marked with cones

    Asphalt Repair

    Potholes, failed patches and raveling fixed with proper cut-outs and compacted hot mix.

  • Roller compacting new asphalt on an outdoor basketball court

    Sports Courts

    Pickleball, tennis, basketball and multi-use courts: base, surfacing, color coating and striping.

  • Speed bump location marked out and prepped on asphalt before installation

    Speed Bumps

    Asphalt speed bumps and humps installed to spec and striped for visibility.

  • Hot-pour crack sealing across a shopping center parking lot

    Crack Sealing

    Hot-pour rubberized sealant that keeps water out of the base before cracks turn into potholes.

  • Compacted base and new asphalt going down beside a school building

    Excavation & Grading

    Subgrade prep, base course and drainage planning so the pavement on top lasts.

Two ways to work with us

Hire us to pave it, or bring us in to plan, price and oversee the project.

How a job runs

We do not guess at a number over the phone. We measure first.

  1. Tell us about the job

    Call or send the form with the location and what you need.

  2. Site visit

    We walk the property, measure it and check the base and drainage.

  3. Itemized estimate

    Square footage, thickness, materials, hauling and labor in writing, usually within 48 to 72 hours.

  4. Schedule and pave

    We set dates around your traffic and the weather, do the work and walk it with you.

Recent work

A few of the jobs we have finished around the island.

  • Newly paved private asphalt road winding through open pasture
  • Newly paved asphalt driveway and carport apron at a single-story home
  • Roller compacting new asphalt on an outdoor basketball court
  • New asphalt on an urban lane with high-rise buildings behind
  • Freshly seal coated asphalt lot beside a lighthouse
  • New asphalt driveway leading to a home garage
  • Roller finishing new asphalt in a market parking lot
  • Fresh asphalt driveway under a shade tree with mountains behind

See all projects

All over Oahu

We are based in Wahiawa, in the middle of the island, so nowhere is far.

All service areas

Common questions

How fast can I get an estimate?

Most written estimates go out within 48 to 72 hours of the site visit. Every estimate is itemized, so you can see square footage, thickness, materials and labor line by line.

Are estimates free?

Yes. Estimates are free and come with no obligation.

Are you licensed and insured?

Yes. Oahu Asphalt is licensed and insured, and so is any partner contractor we bring onto a project.

Do you work on both homes and commercial property?

Yes. We pave single driveways, HOA and townhome roads, retail and office parking lots, church and school lots, and industrial yards.

Can you work nights or in phases so my lot stays open?

Yes. After-hours and phased schedules are available for high-traffic sites.

How long does asphalt last in Hawaii?

Properly built and maintained asphalt can last 15 to 25 years here. Crack sealing and seal coating on a regular cycle are what get you to the long end of that range.

When is the best time of year to pave on Oahu?

The drier months, roughly April through October, are the easiest to schedule. We pave year-round and simply work around the rain.

Do you recycle old asphalt?

Where possible, yes. Milled and removed asphalt is hauled for recycling into new mix.

Do you offer maintenance plans?

Yes. We set up annual and multi-year maintenance schedules for HOAs, property managers and homeowners.

CallFree estimate